1. When install three-way ball valve, must note flow direction mark on the valve body, in order to avoid flow direction error, therefore effect to use.
2. After apply three-way ball valve must ensure that under valve full open condition wash the pipeline in order to avoid welding slag etc. sundries scuffing sealed surface.
3. Generally, three-way ball valve all set up by-pass pipe line, when repair or change ball valve can use by-pass pipeline makes process run as usual.
4. Pneumatic three-way ball valve can be erect or lie down installed in level positive 180o scope, pneumatic actuator never downward reverse install.
5. Debugger of positioner or electromagnetic valve detail see manual.
6. Pneumatic actuator crank web is square head structure, can use as hand device, when fail removing gas source pipe can directly using hand spanner immediately realize manual operation.
7. If find packing chamber leakage during operation process, tighten gland stud can immediately solve it.
|